Imported USA standard shuttering being fixed for lift wall.
folding for fixing of columns and wall steel for the Ground Floor slab
Concreting of shear walls and columns in progress on Tower A-March 2013, before casting of the ground floor slab.
Fixing of shuttering and steel reinforcement for casting of ground floor slab of Tower A- March 2013
Tower A-Ground Floor casted on 25TH March, 2013
Tower B- Ground floor casted in May 2013